Shoals is proud to provide First Solar with products from the back of their advanced thin film panel, to the inverter.  We would love to work with you on your next First Solar project!

 

Our products include:

Junction Boxes

Wire Assemblies

Harnesses

Whips

Jumpers

Combiner Boxes

Trackers

Monitoring

GLOBAL PRESENCE

CERTIFICATIONS

LEADING BOS MANUFACTURER

REGIONAL COVERAGE

North America

Latin America

Europe

MENA

APAC

COMPANY PRESENCE

HQ, BD, MFG

BD

BD

BD

BD, MFG

PROJECTS

A sampling of First Solar projects Shoals has supplied to:

Project

Agua Caliente

Antelope Valley Solar Ranch 1

Butler Solar Facility

Catalina Solar Project

Copper Mountain Solar 1 | 2 | 3

Desert Sunlight Solar Farm Project

Moapa Southern Paiute

McCoy Solar Energy Project

Nyngan

Stateline Solar Farm Project

Topaz Solar Farm

Location

Arizona

California

Georgia

California

Nevada

California

Nevada

California

Australia

California

California

MW

290

242

103

143

458

550

250

250

102

296

550

SERIES 6 INSTALLATION

COMBINER BOX BILL OF MATERIALS

• Combiner boxes                                           4

• 8 awg underground whips              ~850 ft

• 8 awg row jumpers                         ~ 1900 ft

• 6 string harness set                                 56

• Trenching                                            ~ 120 ft

• Conduit stub-ups                                      28

BLA BILL OF MATERIALS

• Non-fused disconnect boxes                   4

• 7 row BLA set                                                 4

• 6 string harness set                                 56

BLA Requires:                   

NO Row Jumpers

NO Trenching

NO Conduit Stub-Ups

SERIES 4 INSTALLATION

COMBINER BOX BILL OF MATERIALS

• Combiner boxes                                           4

• 8 awg underground whips              ~850 ft

• 8 awg row jumpers                         ~ 1900 ft

• 8 string harness set                                 56

• Trenching                                            ~ 120 ft

• Conduit stub-ups                                      28

BLA BILL OF MATERIALS

• Non-fused disconnect boxes                   4

• 7 row BLA set                                                 4

• 8 string harness set                                 56

BLA Requires:                   

NO Row Jumpers

NO Trenching

NO Conduit Stub-Ups

© 2020 Shoals Technologies Group