Project Background
On December 14, 2020, Silicon Ranch and United Power commissioned Rattlesnake II in Weld County, Colorado. The 6-megawatt (MWac) solar energy plant is an expansion of the 16 MWAC Rattlesnake I, which was the largest cooperative solar farm in Colorado when it was commissioned in 2017.
Key Facts
- 6 MWAC
- Silicon Ranch
- Platteville, CO
- Install 2020
- United Power